queerjudaismsproject

Antisemitism is an axis of oppression. Jews can’t oppress non-jews on the specific basis of their non-jewishness (though of course jews can oppress non-jews on plenty of other axes) SO goy/goyim can’t be considered a slur because it’s a term used by an oppressed group to name the group that is their oppressor. The material conditions for goyim to be an oppressive term just don’t exist.  I cannot believe this discourse right now.