Antisemitism is an axis of oppression. Jews can’t oppress non-jews on the specific basis of their non-jewishness (though of course jews can oppress non-jews on plenty of other axes) SO goy/goyim can’t be considered a slur because it’s a term used by an oppressed group to name the group that is their oppressor. The material conditions for goyim to be an oppressive term just don’t exist. I cannot believe this discourse right now.
anxiousnerd300 liked this
misiu liked this
loud-distorted-screaming liked this
silver-cats liked this
fabulesque liked this
aikotters reblogged this from professorspork
neverfeedthesarlacc liked this
ghostomatic liked this